Fourteen days, from your slab to your counters.
We can promise two weeks since nothing leaves the building. The saw, the polishers and the install crew are all ours, at one address.
The fourteen days
| Day | What happens | Your part |
|---|---|---|
| Day 1 | You pick a slab. We tag it and write the order | Half down |
| Day 2 or 3 | Laser template of your cabinets, about an hour | Be home, with the sink and faucet on site |
| Day 4 | Paper patterns are laid on your slab | Come look, or approve a photo |
| Days 5 to 10 | Sawing, edging, sink cutouts and polishing | Nothing |
| Day 11 | Every piece is dry fitted in the shop | Nothing |
| Days 12 to 14 | Install, in one day | Clear the counters and empty the sink cabinet |
| The day after | Your plumber reconnects the sink | The rest is due once you have looked it over |
The template visit
A laser on a tripod reads every wall and cabinet to a sixteenth of an inch. No wall is straight, and the stone is cut to yours.
- We check the cabinets for level and strength, and shim what needs it. Stone weighs about 20 pounds a square foot.
- We mark the sink, the faucet holes, the cooktop and every outlet.
- We talk through seams, overhangs and corners, and draw them on the plan you sign.
- Nothing is cut until you have signed that plan.
In the shop
- The layout. Paper patterns go on your slab, so you see where each vein lands before the saw starts.
- The bridge saw cuts the pieces under running water, which keeps the dust down and the blade cool.
- A router shapes the edge and cuts the sink opening.
- Hand polishing brings the edges to the same shine as the face, through seven grits of pad.
- The dry fit. Seams are checked on a table, where they are easy to fix.
Install day
- 8:00. A crew of three arrives. Floors and doorways are covered.
- 8:30. Old tops come out and go on the truck.
- 9:30. The new pieces are carried in on edge, set and leveled.
- 11:00. Seams are pulled tight, filled with color-matched epoxy and polished flat.
- 12:00. The sink is mounted and faucet holes are drilled.
- 1:00. Granite gets its sealer, everything is wiped down, and you walk it with the crew lead.
A large kitchen can run to mid-afternoon. Leave the sink alone for 24 hours while the adhesive cures.
The warranty
- Seams and installation: for as long as you own the house. If a seam opens or a top comes loose, we fix it.
- Quartz carries its maker's own warranty too, most of them for 15 years or more.
- Natural marks in granite and marble, like pits and fine lines, are part of the stone and not a defect. You see them at the layout.
- Not covered: chips from a dropped pot, scorching on quartz, and damage when cabinets settle.
The night before install
Asked about the process
What can slow the fourteen days down?
Cabinets that are not in yet, a sink that has not arrived, or a slab we have to order. We tell you on day one if any of those apply.
Do I have to come to the layout?
No, but most people enjoy it. If you cannot, we text a photo of the patterns on the slab and wait for your yes.
What if a piece breaks during install?
It is rare, and it is ours to fix. We recut it from your slab or a matching one at no cost, and tell you the new date before we leave.
When is the second payment due?
After install, once you have walked the counters with the crew lead and are happy with them.
Day one is picking a slab.
Come any day but Sunday. The fourteen days start when your name goes on the stone.