From the quote to the last gate.

A fence is a two-day job that takes about four weeks, most of it waiting on utility marks and materials. Here is every step, and what we need from you.

Six steps

  1. Quote Jesse measures, and the price is written down before he leaves.
  2. Order Half down. Material is cut and stacked for your job.
  3. Locates We call 811. Lines are flagged within three working days.
  4. Posts Day one. Holes dug, posts set in concrete, plumbed and braced.
  1. Boards Day two. Rails, pickets and gates go on.
  2. Walk it You walk the line with Jesse. The second half is due when you are happy.

The quote visit

A usual timeline

From a yes to a finished fence
WhenWhat happensYour part
Day 1You say yes. We order material and call 811Half down
Week 1Utility flags go in. We file a permit or send HOA drawings, if neededLeave the flags alone
Weeks 2 to 3Waiting for our next open build dayMove anything along the line
Build day 1Posts set in concreteKeep dogs in. Leave the gate open
Build day 2Rails, boards and gatesWalk the fence with Jesse
Spring is slowerMarch to June, the wait is five to six weeksBook in February if you can

Getting the line right

The one mistake we cannot fix cheaply is a fence on the wrong side of the line.

Paying, and the warranty

Who builds it

Before build day

Questions about how it works

Do I need to be home on build days?

For ten minutes at the start of day one, to confirm the line and the gates. After that, no.

What if it rains?

We set posts in light rain. Heavy rain moves the job a day, and we text by 6:30 that morning.

What if you hit rock?

We drill it. Rock is part of building here, and it is in the price.

Can I change something after you start?

Before the posts are set, easily. After, it costs what it costs to move concrete.

Start with a free quote.

Tell us the style and a rough footage. Jesse brings samples and a measuring wheel.