Decking: cedar, treated or composite.

What each one costs, how long it lasts, and how to build a deck that stays flat. With the framing, hardware and screws to go with it.

Three kinds of deck board

Sample prices for this concept site, per 12 ft board
BoardPriceLastsUpkeep
Treated pine, 5/4x6$1415 to 20 yearsStain every two to three years
Cedar, 5/4x6$2915 to 20 yearsSeal yearly, or let it go silver
Cedar, 2x6$3820 years or moreThe same, but stiffer underfoot
Composite$4625 years or moreWash it in spring
Weathered vertical wooden planks in honey and gray tones, side by side

Building a deck that stays flat

  • Joists 16 inches apart, 12 for composite laid on an angle.
  • Treated framing, rated for ground contact if it is near the dirt.
  • Bark side up on wood boards, so they cup less.
  • Two screws at every joist, coated deck screws or hidden fasteners.
  • Flashing tape on top of every joist, so they stay dry.

Treated lumber comes wet

  1. It is soaked under pressure, then shipped, so it is heavy and damp.
  2. Lay the boards tight, with no gap, because they shrink as they dry.
  3. Wait a few weeks to stain, until a drop of water soaks in.
  4. Seal every cut end with end-cut preservative.

What a 12 by 16 deck takes

Sample list for this concept site, ground-level deck
PartAbout
Deck boards, 5/4x6x1632 boards
Joists, 2x8x12 treated13 boards
Beams and rim, 2x8x16 treated6 boards
Posts, 6x6x8 UC4A6 posts
Joist hangers and screwsOne box of each, plus ties

We help with

01

Picking boards

Walk the pile with a yard hand for the straightest, driest stock.

02

Takeoffs

Bring a sketch, get the list and price by the next day.

03

Railings

Wood, composite or cable, priced with the deck.

04

Delivery

Boom truck drops it right in the back yard.

Asked about decking

Is composite worth it?

If you never want to stain again, yes. It costs about three times treated pine up front.

How much extra should I order?

Ten percent on decking for cuts and the odd bad board.

Can I order composite in other colors?

Yes, about five days by special order. Special orders cannot be returned.

Do I need a permit?

Most cities around here want one for a deck over 30 inches off the ground. Call your city first.

Plan the deck this winter.

Bring a sketch and we will price every board, screw and hanger by the next day.