How we build.
From the handshake to the keys. The building goes up in about a week; getting the steel and the site ready takes longer. Here is every step.
From handshake to keys
- Site walk, drawing and price. Us, with you.
- Steel and trusses ordered, permit pulled. Us.
- Level pad with good drainage. Your dirt work or ours.
- Posts and trusses. Our crew.
- Steel, trim and doors. Our crew.
A typical schedule, from the handshake to the keys.
Posts and trusses
- Holes four feet deep, below the frost line.
- Posts set in concrete, plumbed and braced.
- Engineered trusses craned up and tied to every post.
- Purlins and girts spaced for the steel and for insulation later.
Steel and trim
- 29-gauge steel on the roof and walls.
- Screws with rubber washers set straight in rows.
- Trim at every corner, door and eave.
- Every scrap hauled off before we leave.
Who builds it
The Yoder crew has been framing out of Buffalo since 1987, three generations working side by side. We do not sub out the work: the same people who measure your site set the posts and screw down the last piece of trim.
We work in daylight and keep the site neat. If weather holds us up, we tell you the new date the same day. When the building is done, we walk it with you and open every door before we hand over the keys.
Our workmanship carries a five-year warranty in writing, on top of the 40-year paint warranty on the steel. If something we built is not right, call and we come back to fix it.
Asked about the build
Do I need to be home?
Not every day. We like to meet you on the first and last days.
What if it rains?
We stop for storms and wet ground and pick up where we left off.
How do I pay?
Local bank financing, or 25% down and the rest when we finish.
Can I see a finished building?
Yes, a 30 by 40 shop on our lot at 2200 South Ash Street in Buffalo.
Start with a site walk.
We come out, look at the ground and listen to what you need.