Bathroom remodels.
Walk-in showers, tubs, vanities, heated floors, and fixing what the last guy hid. Most bathrooms take 3 to 4 weeks and run $14,000 to $32,000.
What we do in a bathroom
- Tub-to-shower conversions with a low curb or none at all.
- Tile showers built on a waterproof membrane, not just backer board.
- New vanities with more drawers than doors.
- Heated floors under tile, on a timer.
- Grab bars and blocking so you can add them later, even if you do not want them now.
A bathroom, week by week
A typical full bathroom. Tap a week.
Demo, then plumbing and electrical rough-in.
Waterproofing, inspection and tile.
Vanity, toilet, glass measured.
Glass installed, fixtures, final walk.
Choosing finishes
Large tile
Fewer grout lines to clean.
Matte fixtures
Hide water spots better than shiny chrome.
A niche
Built into the shower wall for bottles.
A fan on a timer
So moisture actually leaves.
Curbless showers, grab bars and warm floors
A shower with no curb is often possible by lowering the floor, after we check the framing. Grab bars go in with blocking in the walls so they hold. On cold Ozarks mornings, most people say a heated floor is worth it. Whether to do the kitchen or the bathroom first comes down to which bothers you more every day.
Plan your new bathroom.
Book a free walk-through and get a written price within a week.