Asphalt driveways.

New driveways and overlays, built on six inches of rock and rolled hot. Here is what goes into one, what it costs, and how to make it last 30 years.

A new driveway, start to finish

  • Day one: old surface broken out, soil graded so water runs off.
  • Day two: fabric, then six inches of crushed rock, compacted.
  • Paving day: three inches of hot asphalt in two lifts.
  • Rolled while it is over 250 degrees, for a tight, smooth surface.
  • Barricade up, and keep cars off for three days.
Fresh black asphalt driveway in front of a gray house with a white SUV, snow piled at the edges

Driveway prices

A new driveway cut through: rolled rock base, then two lifts of hot asphalt. An overlay adds only the top lift to a drive whose base is still sound.
New driveway, base and all
$4 to $7 a sq ft. A typical 12 by 60 ft drive: $2,900 to $5,000.
Overlay on a sound old drive
$3 to $4 a sq ft. A typical 12 by 60 ft drive: $2,200 to $2,900.
Widen an existing drive
$5 to $8 a sq ft. A typical 12 by 60 ft drive: priced on site.
Apron at the street
$6 to $9 a sq ft. A typical 12 by 60 ft drive: thicker, for the turn.

Sample prices for this concept site.

Asphalt or concrete?

Freshly paved curving road with a bright white edge line through autumn woods

Hills, curves and long drives

  • Steep drives get extra base and a rougher finish for grip.
  • Curves are rolled with care so edges do not crumble.
  • Long rural drives can be paved in phases over two summers.
  • Culverts checked or replaced before we pave over them.

Why thickness matters

A driveway that cracks in two years was usually laid two inches thick on whatever dirt was there. Cars and trucks press it down, water gets under the edges, and the first hard freeze opens it up. Three inches of hot asphalt on six inches of rock is what holds up under a pickup and a trailer.

We write the depth of the rock and the asphalt on every bid, so you can compare prices fairly. If another bid is much cheaper, check those two numbers first.

Asked about driveways

How long does a driveway take?

Usually three days from tear-out to paving, plus three days to keep cars off.

Do I need to be home?

Only to walk it with us at the end and sign off.

Will the trucks hurt my yard?

We lay boards over curbs and walks. Ruts in the grass get raked and seeded.

Can you pave in the fall?

Until about mid-November, while nights stay above freezing.

Get a price on the spot.

We measure with a wheel and hand you a written price before we leave.