Blacktop Brothers Paving

Concept design by Medeiros Web Design. Blacktop Brothers Paving is a fictional business.

Sealcoating, crack fill and patching.

The cheap work that doubles the life of a driveway or lot. A fresh black coat every three years, cracks sealed before winter, potholes cut out and filled hot.

Prices

Sample prices for this concept site, set against the life of a driveway paved in spring 2027.

  1. Paved. Keep cars off for three days, and leave the sealer for a year while the oils settle.
  2. Hot rubber crack fill, from $1 a foot. Hot rubber in every crack before winter water gets under it.
  3. Sealcoating, 25 cents a sq ft. The first coat, one year after paving.
  4. Sealcoat again. The black comes back and the surface stays tight.
  5. Pothole patch, cut and hot-filled, from $250; edge repair, from $8 a foot. As soon as a hole opens or the edges crumble.

How a pothole happens

  • Water gets into a crack, freezes and pushes it wider.
  • Cars press the softened edges down into the base.
  • The hole grows every freeze and thaw.
  • Cold patch from a bag pops out by spring.
  • We cut it square, tack the edges and fill it hot so it stays.
Close-up of a pothole and a long crack in a worn asphalt road

Sealcoating day

Signs it is time

Why it pays

Sun and rain dry out asphalt and wash the black oils off the top. Once it turns gray, small cracks open, water gets underneath and the base starts to soften. Sealcoat puts a fresh coat back on top, and crack fill keeps the water out of the rock below.

A few hundred dollars every three years is a lot cheaper than tearing out a driveway early. On a parking lot the savings are even bigger.

Asked about sealcoating

Can I sealcoat it myself?

You can. A bucket from the store is thinner than ours, so expect to redo it sooner.

Is sealcoat slippery?

We add sand to the mix for grip.

Can you seal a new driveway?

Wait a year so the oils settle, then seal.

Does crack fill really help?

Yes. Keeping water out of the base is the whole game.

Book before the cold.

Crack fill and sealcoat need warm, dry days. Fall fills up fast.