New houses have mistakes too.

A new house is built by a dozen crews in a few months, and nobody checks the whole of it. Two or three visits, timed to the build, catch what is easiest to fix while it is still easy.

Three visits, timed to the build

Sample prices for this concept site
VisitWhenWhat it is forPrice
Before drywallFraming, wiring and plumbing done, walls still openThe only chance to see inside the walls$300
FinalBefore closing, ahead of your builder walk-throughA full inspection, the same as a buyer'sFrom $325
11-monthMonth ten or eleven after you move inA list for the builder before the one-year warranty ends$325

Before the drywall goes up

  • Framing: notched joists, missing hangers and straps, and studs cut to fit a pipe.
  • Wiring: steel plates where wires pass close to the face of a stud, so a picture nail cannot reach them.
  • Plumbing: drains sloped the right way, and supply lines held so they do not bang.
  • Windows: the flashing tape lapped like shingles, so water runs out, not in.
  • Photos of every wall, so years from now you know where the pipes and wires run.
Worker in gloves fitting pink fiberglass insulation between wall studs in a house under construction

What we find in new houses

From final inspections around Ozark and Nixa
FindingWhereWhy it matters
Soil sloping toward the houseOutside, after the final gradeWater goes under the house instead of away
A disconnected ductCrawlspace or atticPaying to heat the crawlspace
Bath fan not ducted outsideThe atticDamp air rots the roof deck
Insulation pushed asideThe attic, near the hatch and lightsA cold ceiling and a higher bill
No relief pipe on the water heaterThe garage or utility roomA safety item
Hot and cold reversedA sink or showerA scald risk for children
Construction debrisThe crawlspaceFood for termites

The city inspected it. Why us too?

The city's inspection

  • Checks the minimum the building code requires
  • A few minutes at each stage of the build
  • Does not run the dishwasher or open every window
  • In some rural parts of Missouri, there is none at all

Ours

  • Looks at how well it was built, not only whether it passes
  • Hours in the house, attic and crawlspace
  • Tests everything that switches on, opens or drains
  • Works for you, not the builder

Your builder walk-through

Bring our report, a roll of blue painter's tape and an hour.

  1. Tape every flaw you see. Paint, scratches, gaps in trim. Builders fix what is marked.
  2. Open and shut everything. Every window, door, drawer and the garage door.
  3. Run every faucet and look under each sink while it runs.
  4. Flush every toilet and watch the base for water.
  5. Ask for the paperwork: the warranty book, the appliance manuals and the paint colors.
  6. Photograph the list and get it signed before you leave.

The 11-month check

New build visits at a glance

Before drywall About two hours. Book when the builder says the walls are ready to close.
Final About three hours. Before your walk-through with the builder.
11-month About three hours. In month ten or eleven.
Reports Each one within 24 hours, with photos you can forward to the builder.
On site Hard hat and boots, and we follow the builder's site rules.

Asked about new houses

Will my builder let you in?

Most do. Put it in your contract that you may have independent inspections, and give the builder a day's notice.

Do I need the pre-drywall visit if I get a final?

It is the only time anyone can see inside the walls. Once the drywall is up, framing and wiring problems are hidden for good.

The builder says the house has a warranty. Is that enough?

A warranty covers what you report in time. The inspection is how you find out what to report.

Can you come to a house in the country with no city inspection?

Yes, anywhere in our area. Those are the builds where a second look matters most.

Tell us where the build is up to.

Call with the builder's schedule and we will set the visits around it.