Four phases, each with a price and a decision.
Every project moves through Listen, Sketch, Draw and Build. Each phase ends with something you can hold and a decision that is yours, and the fee for the next phase is agreed before it starts.
15% Listen
Listen takes three to five weeks and ends with a written brief: what the building must do, what it may cost, and when it must open.
| How long | 3 to 5 weeks |
|---|---|
| We do | Walk the site at two times of day, interview the people who will use the building, check zoning |
| You get | A written brief, a budget range and a schedule |
| Share of fee | 15% |
What you decide. Whether the budget and the wish list fit each other. If they do not, this is the cheapest moment to change one of them.
25% Sketch
Sketch takes six to ten weeks and ends with one design you have chosen from three, shown in a model you can pick up.
| How long | 6 to 10 weeks |
|---|---|
| We do | Three directions in drawings and cardboard models, each priced by a cost estimator |
| You get | Plans, a model and a cost estimate for the one you choose |
| Share of fee | 25% |
What you decide. Which of the three directions to build. Most clients take one and borrow a room or a roof from another.
40% Draw
Draw takes three to six months and ends with the full set of drawings a builder can price and a city can permit.
| How long | 3 to 6 months |
|---|---|
| We do | Construction drawings and specifications, with the engineers, and the permit application |
| You get | A permit set and at least three builders' bids to compare |
| Share of fee | 40% |
What you decide. The materials and fixtures, room by room, and which builder to hire. We lay the bids side by side so you compare like with like.
20% Build
Build lasts as long as construction, usually nine to eighteen months. We are on site every week until the keys change hands.
| How long | 9 to 18 months |
|---|---|
| We do | Weekly site visits, answers to the builder within two working days, review of every payment request |
| You get | A short written report after each visit, with photographs |
| Share of fee | 20% |
What you decide. Any change that comes up, with its price in writing before the work is done. Nothing is added to your bill on a handshake.
What that looks like in dollars
On a $900,000 house at a 10% fee, the fee is $90,000, paid across about 16 months as each phase is finished.
| Listen, 15% | $13,500 |
|---|---|
| Sketch, 25% | $22,500 |
| Draw, 40% | $36,000 |
| Build, 20% | $18,000, billed monthly through construction |
Engineers, the survey and permit fees are extra and billed at cost, with no markup. On a house they usually come to $12,000 to $20,000.
What we need from you to start
Five things let us start Listen the week you call. Tick off the ones you already have.
Questions about the process
Can we stop after one phase?
Yes. Each phase is its own agreement, and the work you have paid for is yours to keep. About one client in ten stops after Listen, usually because the site was wrong.
What if the bids come in over budget?
We redraw at no charge until the project is back inside the budget set at the end of Sketch. That promise is in the contract.
How often will we meet?
Every two weeks in Listen and Sketch, monthly in Draw, and on site every week during Build if you want to walk it with us.
Who handles the permit?
We do. We submit the drawings, answer the city's comments, and tell you the day it is issued.
Start with Listen
A first conversation is free. Bring the address and a rough budget, and you will leave knowing what Listen would cost for your project.