Shop floors, garage slabs and pads.

Flat, hard and thick enough for what will sit on it. Tell us the heaviest thing going on the floor and we build the slab around that.

Thickness for the load

What we pour for each use
SlabThicknessSteelHolds
Shed or hot tub pad4 inchesWire meshA filled hot tub, a mower, a storage shed
Garage floor4 inchesRebar, 2 foot gridCars and half-ton pickups
Camper or tractor pad5 inchesRebar, 18 inch gridA motorhome or a loaded trailer
Shop floor6 inchesRebar, 16 inch gridA two-post car lift or a skid steer
Under lift posts12 inchesRebar cageThe posts of a 10,000 pound lift

Every one of these sits on four inches of compacted gravel.

What is under the floor

  • Gravel. Four inches, compacted in two layers.
  • Plastic. A heavy vapor barrier under any floor that will be closed in, so damp cannot come up through the slab and rust the tools.
  • Steel on chairs. Rebar lying on the dirt does nothing. Ours sits on plastic chairs in the middle of the slab.
  • A thick edge. The outside foot of the slab goes down twelve inches, which carries the walls.
  • Bolts and sleeves. Anchor bolts for the walls, a sleeve for the water line and conduit for power are set before the truck comes.
Workers walking across a grid of tied steel rebar laid out for a concrete slab, with bundles of bars in front

A shop floor, worked out

The 40 by 60 floor we poured in Republic this year, six inches thick:

40 ft long × 60 ft wide × 0.5 ft thick ÷ 27 = 44.4 yards

With the 10% extra, that was five truckloads, placed with a pump in one morning.

Floor prices. Sample prices for this concept site.
SlabA square footA typical job
Garage floor, 4 inches$7 to $924 by 24 feet: $4,030 to $5,180
Camper pad, 5 inches$8 to $1014 by 40 feet: $4,480 to $5,600
Shop floor, 6 inches$9 to $1140 by 60 feet: $21,600 to $26,400
Shed pad, 4 inches$8 to $1010 by 12 feet: $1,100, our smallest job
Open garage with a smooth gray concrete floor, a wheelbarrow, wooden shelves along the back wall and a ladder

A smooth trowel finish

  • Machine troweled. A power trowel makes three or four passes as the slab sets, until the surface is tight with a dull shine.
  • Flat. Within an eighth of an inch over ten feet, checked with a straightedge. A lift, a workbench and a rolling toolbox all need it.
  • Sloped or level. A garage floor falls an eighth of an inch per foot toward the door. A lift bay is poured dead level.
  • Sealed the same day. A cure-and-seal is sprayed on while the slab is still damp, which keeps the dust down for good.
  • Coatings wait. Epoxy and paint need 30 days of curing first, or they peel.

Settle these before the pour

All four cost little on pour day and a great deal with a jackhammer afterward.

Ready for pour day

We walk the site with you two days ahead and tick these off together.

Asked about slabs

How soon can I build on it?

Framing can start after three days. Cars go on at seven days, and a lift or a loaded trailer at 28.

Can a lift go on the garage floor I have?

Maybe. Lift makers ask for at least four inches of sound concrete, and many house garages are a little under. We drill a test hole and measure for $75. If it is thin, we cut out two squares and pour pads.

Can you pour inside a pole barn that is already up?

Yes. The concrete goes in by pump or power buggy through the door. Posts get wrapped with joint material so the floor and the building can move apart.

Do you pour footings and foundations?

Footings and short walls for garages, shops and room additions, yes. Full basements, no.

Tell us what it has to hold.

Send the size and the heaviest thing going on it. A written price comes back within two days.