Panel upgrades and house wiring.
The panel is the heart of the house. When it is too small, too old or one of the brands that fail, everything else is working on borrowed time.
When a panel needs replacing
Call today
Rust, scorch marks or a hot cover
Water or heat has been inside. It will not get better.
Call today
A fuse box with pennies or foil
Somebody defeated the fuses. The wires have no protection.
This year
A panel on the recall lists
A few brands from the 1950s to the 1980s have breakers that fail to trip. We tell you if yours is one.
This year
No room for another breaker
Doubled-up wires and tandem breakers everywhere.
Plan for it
100 amps, and plans
An EV, a hot tub, a shop or a heat pump will need more.
Plan for it
Sixty amp service
Common in houses before 1960. Many insurers now ask about it.
What it costs
With the permit, the inspection and the utility visit. Sample prices for this concept site.
| Job | What it is | Price |
|---|---|---|
| Panel swap, same size | A new 100 or 200 amp panel on the existing service | $1,900 to $2,600 |
| Upgrade to 200 amps | New panel, meter base, service cable and grounding | $3,200 to $4,400 |
| Subpanel | A second panel for a garage, a shop or an addition | $850 to $1,600 |
| Grounding and bonding | New ground rods and a bond to the water line | $380 |
| Arc-fault breakers, a whole panel | Breakers that trip on a sparking wire | $60 a circuit |
Panel jobs can be split into monthly payments. Ask when we give you the price.
Panel day
The power is off for about six hours, usually 8 AM to 2 PM.
The utility pulls the meter
We book this. Everything in the house goes off.
The old panel comes out
Every wire is tagged with its circuit before it is moved.
The new one goes in
New breakers, new grounding, and every connection tightened to its rated torque.
The inspector looks
We meet them. You do not need to be home.
Power is back
With a typed list of every circuit on the panel door.
How big a service do you need?
- 100 amps runs a gas-heated house with ordinary appliances.
- 150 amps adds central air and an electric range comfortably.
- 200 amps is the standard for new houses, and what an EV charger or a heat pump wants.
- 320 or 400 amps is for all-electric houses with a shop or two EVs.
- We work it out with a load calculation, on paper, and leave you a copy.
Old wiring
| Wiring | Built about | What we advise |
|---|---|---|
| Knob and tube | Before 1940 | Replace it. Insulation in the attic makes it overheat |
| Cloth-covered cable | 1940 to 1960 | Check it. Replace where the cloth is brittle |
| Two-wire, no ground | Before 1965 | Add grounded circuits where electronics plug in |
| Aluminum branch wiring | 1965 to 1973 | Keep it, with approved connectors at every outlet and switch |
| Modern copper cable | After 1973 | Usually fine. Add GFCI and arc-fault protection |
An inspection of the whole house takes about an hour and costs $145. You get a written list in order of urgency.
Remodels and additions
- Kitchens need two counter circuits, and one each for the fridge, dishwasher, disposal and microwave.
- Bathrooms need their own 20 amp circuit and a fan vented outdoors.
- Finished basements need arc-fault protection and an egress light.
- We work with your builder, or pull the permit ourselves if you are your own contractor.
- Rough-in and finish are two visits, with an inspection after each.
Before panel day
Asked about panels
Do I need a permit?
Yes, and we pull it. The city inspects the work, and we are there for it.
Will my insurance want this done?
Insurers often ask about fuse boxes, 60 amp service and the recalled brands. A new panel with a permit answers the question.
Can you add circuits without a new panel?
If there are open spaces and the load allows it, yes. We check both before we quote.
How long does a 200 amp panel last?
Forty years or more. The breakers may need replacing sooner.
Not sure about your panel?
Send a photo of it with the door open. We will tell you the brand, the size and whether to worry.