Site prep · pads · driveways

Pads and driveways.

Everything built on a lot sits on what we do first. A pad that is level, packed and drained saves more money than any other part of a build.

What a good pad is

Four things, in this order.

Pad prices

On fairly level ground, with base rock. Sample prices for this concept site.

Usual ranges
PadSizeUsual price
Shed or carport20 by 24 feet$1,400 to $2,200
Garage30 by 40 feet$2,800 to $4,500
Shop40 by 60 feet$4,500 to $7,500
HouseAbout 2,400 square feet$5,500 to $9,500
Barndominium50 by 80 feet$8,000 to $13,000

Slope changes the price most. Every foot of fall across the pad adds fill, and fill is trucked in by the load.

Clearing and grading

  • Brush and small trees are pushed, piled and burned or hauled.
  • Stumps come out whole. A stump left under fill rots and leaves a hole.
  • Trees worth keeping are flagged first, and we stay off their roots.
  • Rough grade shapes the lot so water has somewhere to go.
  • Finish grade comes after the build, with topsoil put back for a yard.
  • An acre of light brush is about a day. Heavy timber is three or four.
Bulldozer with a ripper working across a cleared field in a cloud of dust

Gravel driveways

A driveway that lasts is built in layers, like a road.

A 12 foot wide driveway. Sample prices for this concept site.
LengthBase rockBuilt newRegrade and top up
100 feetAbout 22 tons$1,800 to $2,600$650
300 feetAbout 65 tons$4,800 to $6,800$1,500
600 feetAbout 130 tons$9,000 to $13,000$2,700
Culvert at the road, 15 inch$650 to $900

How a pad job goes

Usually two to four days of machine time.

  1. Day 1: strip and cut

    Topsoil off and piled. The high side is cut down.

  2. Day 2: fill and pack

    Fill goes in eight-inch layers, each rolled before the next.

  3. Day 3: rock

    Base rock is spread, wetted and rolled.

  4. Day 4: check

    We shoot the pad with a laser. Within an inch across the whole thing, or we fix it.

Before we bring the machines

Questions about pads

How long before I can build on it?

Right away on cut ground. A pad built on more than two feet of fill should sit through a few good rains first.

Do you pour the concrete?

No. We leave the pad ready for your concrete crew, and we work with most of the ones around Rogersville.

What if my lot is on a hill?

We cut into the slope and build out with the dirt we cut. A walk-out basement is often the cheapest answer on a steep lot.

Can you fix a driveway that washes out?

Usually it needs a crown, a ditch and a culvert, not more gravel. We look at where the water comes from first.

Walk it with Wade.

Site visits are free within 40 miles of Rogersville. Bring your building plans, even rough ones.