Site prep · pads · driveways
Pads and driveways.
Everything built on a lot sits on what we do first. A pad that is level, packed and drained saves more money than any other part of a build.
What a good pad is
Four things, in this order.
- Stripped Topsoil and roots come off and are stockpiled. Nothing is built on black dirt.
- Cut and filled High ground is cut down and low ground built up in thin layers, each one packed.
- Rocked Four to six inches of base rock, rolled until a loaded truck leaves no track.
- Drained The pad sits above the ground around it, and every side slopes away.
Pad prices
On fairly level ground, with base rock. Sample prices for this concept site.
| Pad | Size | Usual price |
|---|---|---|
| Shed or carport | 20 by 24 feet | $1,400 to $2,200 |
| Garage | 30 by 40 feet | $2,800 to $4,500 |
| Shop | 40 by 60 feet | $4,500 to $7,500 |
| House | About 2,400 square feet | $5,500 to $9,500 |
| Barndominium | 50 by 80 feet | $8,000 to $13,000 |
Slope changes the price most. Every foot of fall across the pad adds fill, and fill is trucked in by the load.
Clearing and grading
- Brush and small trees are pushed, piled and burned or hauled.
- Stumps come out whole. A stump left under fill rots and leaves a hole.
- Trees worth keeping are flagged first, and we stay off their roots.
- Rough grade shapes the lot so water has somewhere to go.
- Finish grade comes after the build, with topsoil put back for a yard.
- An acre of light brush is about a day. Heavy timber is three or four.
Gravel driveways
A driveway that lasts is built in layers, like a road.
| Length | Base rock | Built new | Regrade and top up |
|---|---|---|---|
| 100 feet | About 22 tons | $1,800 to $2,600 | $650 |
| 300 feet | About 65 tons | $4,800 to $6,800 | $1,500 |
| 600 feet | About 130 tons | $9,000 to $13,000 | $2,700 |
| Culvert at the road, 15 inch | $650 to $900 |
- A crown down the middle sheds water to both sides.
- Fabric under the rock on soft ground keeps gravel from sinking into mud. It adds about a dollar a foot.
- Two-inch clean rock first at a muddy entrance, then base rock on top.
- A turnaround big enough for a delivery truck saves your yard.
How a pad job goes
Usually two to four days of machine time.
Day 1: strip and cut
Topsoil off and piled. The high side is cut down.
Day 2: fill and pack
Fill goes in eight-inch layers, each rolled before the next.
Day 3: rock
Base rock is spread, wetted and rolled.
Day 4: check
We shoot the pad with a laser. Within an inch across the whole thing, or we fix it.
Before we bring the machines
Questions about pads
How long before I can build on it?
Right away on cut ground. A pad built on more than two feet of fill should sit through a few good rains first.
Do you pour the concrete?
No. We leave the pad ready for your concrete crew, and we work with most of the ones around Rogersville.
What if my lot is on a hill?
We cut into the slope and build out with the dirt we cut. A walk-out basement is often the cheapest answer on a steep lot.
Can you fix a driveway that washes out?
Usually it needs a crown, a ditch and a culvert, not more gravel. We look at where the water comes from first.
Walk it with Wade.
Site visits are free within 40 miles of Rogersville. Bring your building plans, even rough ones.