Estimates · hourly rates · what changes a price
How we price a job.
Dirt work has more unknowns than most trades. Here is how we work out a price, what can change it and what never will.
Two ways to pay
- By the job One price for a pad, a driveway or a septic system. It covers machines, operators, rock and permits.
- By the hour For clearing, cleanup and jobs nobody can measure ahead. You get the hours in writing each day.
- By the load For gravel, dirt and hauling. The scale ticket is the bill.
- Never by surprise If something changes the price, the machine stops and you get a call first.
Hourly rates
Each rate includes the operator and fuel. Sample prices for this concept site.
| Machine | An hour | Good for |
|---|---|---|
| Dozer | $165 | Clearing, pads, ponds and grading |
| Excavator | $155 | Digging, stumps, septic and trenches |
| Wheel loader | $130 | Loading trucks and moving rock |
| Skid steer | $110 | Tight yards, spreading and cleanup |
| Tandem dump truck | $115 | Hauling |
| Hydraulic rock hammer | $210 | Breaking ledge rock |
There is a four-hour minimum, and $150 to move a machine to your place and back.
What changes a price
Five things, in order of how much they matter.
- Slope. Every foot of fall means more cut and more fill.
- Rock. Nobody knows until the bucket finds it.
- Haul distance. How far the gravel comes, and how far the spoil goes.
- Access. A tight gate or a soft field can mean smaller machines and more hours.
- Water. Mud doubles the time. That is why big jobs are booked for late summer and fall.
What is in a written estimate
| Line | What it tells you |
|---|---|
| The work | What will be dug, moved or built, with sizes |
| The rock | The kind, the tons and the price a ton |
| The price | A fixed number, or an hourly rate with a likely range |
| What is not included | Rock breaking, seeding or permits, if any are left out |
| The rock clause | The hourly rate if we hit ledge, and a promise to call first |
| When | The week we expect to start, and how many days |
How the schedule works
We give you a week
Not a day. Weather decides the day.
We call the Friday before
With the day the machines will arrive.
Rain moves everything
One wet day costs one day. A wet week can cost two.
We finish what we start
The machines stay on your job until it is done.
Paying
- Nothing down on jobs under $5,000.
- A third down on larger jobs, when the machines arrive.
- The balance when you have walked the finished job with Wade.
- Card, check or bank transfer. Cards add 3%.
- Builders are billed twice a month.
- Insured. Ask, and the certificate is emailed the same day.
What to tell us for a quick price
Questions about price
Is the estimate free?
Yes, within 40 miles of Rogersville. Wade walks the land with you.
Why not always give a fixed price?
We do when we can see the whole job. For clearing or pond cleanouts, an honest hourly rate costs you less than a padded fixed price.
What if it takes less time than you said?
On hourly work, you pay for the hours worked. Jobs finish under the estimate about a third of the time.
Can I save money doing part myself?
Sometimes. Cutting your own trees and burning your own brush can take a day off a clearing job.
Get a number in writing.
A site visit takes about half an hour, and the estimate is in your email within two days.