Seven to nine months, one stage at a time.
A house goes up in a set order, and each stage has one thing you should see before the next one covers it. Here is the calendar, what you hear from us along the way and how the money moves.
Before we dig: six to eight weeks
- First meeting. At the model home or your kitchen table. We talk about how you live, not about countertops.
- Plan and price. We settle the plan and give you one fixed number, with every line shown.
- Selections. Two afternoons with our designer choosing brick, floors, cabinets and fixtures.
- Loan and permits. Your bank approves the construction loan while we pull the permits.
Month by month
| Month | What happens | What you see |
|---|---|---|
| 1 | Dirt work, footings and the slab or basement walls | The shape of the house on the ground |
| 2 | Framing: floors, walls and roof trusses | Rooms you can stand in |
| 3 | Roof, windows, doors and house wrap | A house that keeps rain out |
| 4 | Wiring, plumbing, heating, then the leak test | Every wire and pipe, before drywall hides them |
| 5 | Insulation, drywall and paint | Walls and ceilings |
| 6 | Cabinets, floors, trim and tile | The choices you made, in place |
| 7 | Fixtures, driveway, grading and the final walk | Your keys |
A two-story home, a basement or a wet spring adds one to two months.
What two of those months look like


What you hear from us
- Every Friday
- Photos of the week's work by text or email, with a line on what is next.
- One phone number
- The brother running your job answers it. You do not get passed around.
- Two walk-throughs
- Before drywall, to see what is inside the walls. At the end, with a list we finish before closing.
- Changes in writing
- If you change your mind mid-build, you see the price and the days it adds before anyone picks up a tool.
How the money moves
With a construction loan, the bank pays us in five draws. Its inspector checks the work before each one, so you never pay ahead of what is built.
| Draw | When it is paid | Share |
|---|---|---|
| 1 | Foundation is poured | 15% |
| 2 | Framing and roof are up | 25% |
| 3 | Wiring, plumbing and heating pass inspection | 20% |
| 4 | Drywall, cabinets and floors are in | 25% |
| 5 | Final walk is done and the list is finished | 15% |
Asked about the build
What if the weather stops work?
It will, a few times. We plan for twelve lost days in a build and tell you on Friday when one has cost us. It does not change your price.
What if lumber goes up after I sign?
That is our problem, not yours. The number in your contract is fixed, and we lock in the framing package the week you sign.
Can I do some of the work myself?
You can supply your own light fixtures and appliances. Work behind the walls has to be ours so the warranty holds.
What happens after I move in?
We check in at 30 days and come back at month 11 to fix nail pops, sticky doors and anything else that settled.
Where are you in all this?
Whether you are a year out or ready to break ground, a first talk costs nothing. Call, or send the short form on the home page.