Seven to nine months, one stage at a time.

A house goes up in a set order, and each stage has one thing you should see before the next one covers it. Here is the calendar, what you hear from us along the way and how the money moves.

Before we dig: six to eight weeks

  1. First meeting. At the model home or your kitchen table. We talk about how you live, not about countertops.
  2. Plan and price. We settle the plan and give you one fixed number, with every line shown.
  3. Selections. Two afternoons with our designer choosing brick, floors, cabinets and fixtures.
  4. Loan and permits. Your bank approves the construction loan while we pull the permits.

Month by month

A one-level home in fair weather
MonthWhat happensWhat you see
1Dirt work, footings and the slab or basement wallsThe shape of the house on the ground
2Framing: floors, walls and roof trussesRooms you can stand in
3Roof, windows, doors and house wrapA house that keeps rain out
4Wiring, plumbing, heating, then the leak testEvery wire and pipe, before drywall hides them
5Insulation, drywall and paintWalls and ceilings
6Cabinets, floors, trim and tileThe choices you made, in place
7Fixtures, driveway, grading and the final walkYour keys

A two-story home, a basement or a wet spring adds one to two months.

What two of those months look like

Single-story house framed in lumber and sheathed in plywood, with roof trusses stacked on the ground in front
Month 2. Walls are sheathed and the trusses are waiting to go up.
New one-story house with its roof on and gray house wrap on the walls, surrounded by scaffolding on a bare dirt lot
Month 3. Roof on, windows in, wrapped against the weather.

What you hear from us

Every Friday
Photos of the week's work by text or email, with a line on what is next.
One phone number
The brother running your job answers it. You do not get passed around.
Two walk-throughs
Before drywall, to see what is inside the walls. At the end, with a list we finish before closing.
Changes in writing
If you change your mind mid-build, you see the price and the days it adds before anyone picks up a tool.

How the money moves

With a construction loan, the bank pays us in five draws. Its inspector checks the work before each one, so you never pay ahead of what is built.

The five draws
DrawWhen it is paidShare
1Foundation is poured15%
2Framing and roof are up25%
3Wiring, plumbing and heating pass inspection20%
4Drywall, cabinets and floors are in25%
5Final walk is done and the list is finished15%

Asked about the build

What if the weather stops work?

It will, a few times. We plan for twelve lost days in a build and tell you on Friday when one has cost us. It does not change your price.

What if lumber goes up after I sign?

That is our problem, not yours. The number in your contract is fixed, and we lock in the framing package the week you sign.

Can I do some of the work myself?

You can supply your own light fixtures and appliances. Work behind the walls has to be ours so the warranty holds.

What happens after I move in?

We check in at 30 days and come back at month 11 to fix nail pops, sticky doors and anything else that settled.

Where are you in all this?

Whether you are a year out or ready to break ground, a first talk costs nothing. Call, or send the short form on the home page.